An unattended factory is a system problem. Tedix first asks its owning tedi to resume useful work. A person is asked only for a specific decision, consent or fact the worker cannot supply.
The existing commitment wake job checks active projects and objectives every two minutes. It reads registered lanes, Work heartbeats, linked skill and factory runs, and objective task activity. Paused, archived and finished projects are excluded. Objectives already represented by an active project are handled through that project, rather than receiving a second wake.
Set a continuity policy
Factories use their canonical Work project for continuity. Link a Workspace’s
factory to that project so its runs count as activity. Use the existing project
update operation to set metadata.continuity, preserving other metadata:
{
"continuity": {
"idleHours": 24,
"cadence": {
"everyHours": 24,
"minResults": 1,
"description": "At least one delivered result each day"
}
}
}The idle threshold defaults to 24 hours; allowed values are 15 minutes through
30 days. An unlinked objective can use the same policy under
gateConfig.continuity. A project uses its own policy.
The project lead, or its linked objective’s tedi, owns recovery. Optional
coordinatorTediId names an active tedi in the same organization to take over
when the owner is missing or inactive. Without either, Tedix records no owner
in its learning ledger; it does not fabricate an owner or send a housekeeping
request to a human.
Cadence periods begin at project or objective creation and use elapsed hours
in UTC. The latest complete period is kept when at least minResults canonical
Work items reached completed during it. Model replies, successful skill runs
and heartbeat traffic alone do not count as delivered results. A missed promise
requests recovery even when activity is fresh. New activity during that same
missed period does not cause another resume request.
Recovery and Attention
The resume turn reads pending Work, chooses the next useful item, and starts it or dispatches a lane through the existing admission path. It must check leases and existing requests first. A wake grants no additional approval, budget or Work Attempt. With no open items, the tedi is instructed to propose three next goals and continue an already authorized one.
Only an accepted recovery appears in Stalled. The copy says that a tedi resume was requested, with its timestamp and observed cause. Acceptance is not proof that execution started. If an open decision is addressed to the current viewer, the panel instead names that decision and links to its request. Another person’s question is never shown as yours. Raw gaps and missed promises awaiting a recovery acceptance do not become human to-dos.
Retries reuse one incident key and the runtime’s durable wake deduplication. If a scope remains idle, a fresh bounded recovery is requested after another whole idle threshold; acceptance cannot suppress recovery forever. Cadence misses receive at most one resume request per completed cadence period. The coordinator must reuse an existing open request for the same scope and blocker, creating one Needs-you ask only when the human is needed. The ask must state the blocker, exact decision, options and evidence link.
Every incident records its observed one-line cause in the existing learning ledger. A cause recurring in three distinct incidents produces one proposed automation fix with those incidents as evidence. Proposals still require the normal review; they do not change policy automatically. The resume turn is instructed to record its verified cause and action receipt as follow-up evidence.
Coordinator morning brief
Discover get_project_continuity through the CLI’s tool catalog before using
it. This read-only operation returns stalls, promises and a next cursor.
Pass next as after until it is null. Each promise includes its name, period,
kept/missed status, delivered/required counts and project link. It performs no
wake or external action.
An installed coordinator’s morning brief should include a short Promises kept/missed line and name the affected factories with counts and links. Read the canonical report, then verify any claimed recovery through Work and run receipts. Do not infer completion from wake acceptance or from local log files. Updating an installed coordinator skill and proving its next scheduled brief are separate live operations; publishing source does not update that skill.